CCSI logo
Focused certification exam prep
Start practice

CCSI Cheat Sheet 2026: One-Page Review of Must-Know Facts

TL;DR
  • CCSI here means Concrete Construction Special Inspector, an ACI credential, not any other certification sharing the acronym.
  • Two separate open-book components: about 80 written-inspection questions in three hours, about 20 plans-reading questions in one hour.
  • Each component needs at least 70%, and both must be passed within one year of each other.
  • Current ACI Concrete Field Testing Technician Grade I is a prerequisite, with its own separate practical assessment.

Which CCSI This Sheet Covers

This cheat sheet is about the ACI Concrete Construction Special Inspector credential, issued under the American Concrete Institute's certification program. It is the full Special Inspector credential, not the Associate level, and it is administered through ACI-approved examiners and local Sponsoring Groups, with grading by ACI. If you landed here looking for a different certification that happens to abbreviate the same way, the figures below will not apply to it. For background on the name itself, see What Does CCSI Stand For? and What Is CCSI Certification?.

How to use this page: Treat it as a memory aid, not a source of record. The governing document is the ACI certification policy (ACI CPP 630.1-15), and your local Sponsoring Group controls scheduling and pricing. Confirm anything edition-specific with them before you buy books or commit to a date.

Exam Format at a Glance

ItemWritten InspectionPlans Reading
Question countApproximately 80 multiple-choiceApproximately 20 multiple-choice
Time allowedThree hoursOne hour
Open bookYes, with approved listed technical referencesYes, with approved listed technical references
Minimum scoreAt least 70%At least 70%
Timing ruleBoth components must be passed within one year of each other

Question counts are approximate, and the two components stay separate. Do not combine them into a single "100 questions, four hours" exam, because the program does not describe it that way. Oral administration is possible only with ACI approval.

Some course marketing and the generic introduction of the Job-Task Analysis mention "performance" examinations. The selected program and the certification policy specify written inspection plus plans reading, so do not assume a third CCSI practical exam. The practical element you will meet belongs to the Field Testing Technician prerequisite, discussed next. For a full read on difficulty, see How Hard Is the CCSI Exam? and for the score threshold, CCSI Passing Score 2026.

Eligibility, Validity and Recertification

The Field Testing Technician Condition

Full certification requires one of two things: current ACI Concrete Field Testing Technician Grade I certification, or previous Grade I certification plus passing its current written examination within one year of the first Inspector examination you pass. In both cases you also need acceptable employer-verified experience. The Grade I practical assessment is its own requirement and is not a CCSI exam component.

Education and Experience Pathways

BackgroundExperience Needed
ABET-accredited bachelor's in Civil Engineering, Civil Engineering Technology, Engineering Technology, Construction Engineering, or Construction Engineering Technology, with qualifying concrete courseworkSix months of satisfactory experience
Another engineering bachelor's degreeOne year
At least two years of college or technical study totaling at least 60 creditsTwo years
High-school equivalentThree years
No qualifying education routeFive years of satisfactory experience

Degree acceptability and experience remain subject to ACI policy. Employer verification must establish decision authority, compliance and field evaluation, reporting and inspection proficiency, including the required concrete-testing experience. Associate status does not replace any of the full-credential requirements. The detailed walk-through is in CCSI Requirements 2026.

Five-Year Validity and Renewal

Certification is valid for five years after all requirements are satisfied. Recertification uses the criteria current at the time, including the Field Technician Grade I condition and both examinations. Experience is not reevaluated for renewal at the same level.

The 17 Reference Headings

The seventeen headings below come from the public Job-Task Analysis for ACI Certification of Concrete Construction Special Inspector (the document carries an approval date of 2/17/2014 and is 17 pages). Sixteen are reference headings and the seventeenth is the plans-reading component. Seventeen is a serialization count, not an official weighted blueprint. No heading is published as the heaviest, and the public headings do not prove exhaustive coverage of the paid standards. Our full breakdown is in CCSI Exam Domains 2026.

Domains 1-4: Language, Tolerances, Lightweight Aggregate, Specifications

The vocabulary and acceptance-criteria foundation.

  • D1: ACI Concrete Terminology
  • D2: ACI 117, Specification for Tolerances for Concrete Construction and Materials
  • D3: ACI 213R, Guide for Structural Lightweight-Aggregate Concrete
  • D4: ACI 301, Specifications for Structural Concrete

Domains 5-7: Slabs, Mixing and Placing, Pumping

Day-to-day placement guidance.

  • D5: ACI 302.1R, Guide to Concrete Floor and Slab Construction
  • D6: ACI 304R, Guide for Measuring, Mixing, Transporting, and Placing Concrete
  • D7: ACI 304.2R, Placing Concrete by Pumping Methods

Domains 8-11: Weather, Curing and Consolidation

Environmental protection and the finishing steps that decide durability.

  • D8: ACI 305R, Guide to Hot Weather Concreting
  • D9: ACI 306R, Guide to Cold Weather Concreting
  • D10: ACI 308R, Guide to Curing Concrete
  • D11: ACI 309R, Guide for Consolidation of Concrete

Domains 12-16: Code, Formwork, Inspection Manual, Building Code, Reinforcing Practice

The structural and regulatory layer.

  • D12: ACI 318, Building Code Requirements for Structural Concrete
  • D13: ACI 347R, Guide to Formwork for Concrete
  • D14: ACI SP-2, Manual of Concrete Inspection
  • D15: ICC 2015 International Building Code
  • D16: CRSI Manual of Standard Practice

Domain 17: Plans-Reading Exam

The separate one-hour component, covered in its own section below.

Page-span trap: The Job-Task Analysis assigns each heading its own page range, and the spans are not interchangeable. Domain 14 (ACI SP-2) occupies pages 12-16, by far the longest stretch, while Domain 2 (ACI 117) sits on a single page. Page length is not exam weight, but it does hint at how much task detail the issuer published for that reference.

Numbers and Rules Worth Memorizing

These are the figures that actually appear in the program materials. Nothing here is a pass rate or a salary statistic, and we do not publish any because none are verified for this credential. For the discussion of what is and is not known, see CCSI Pass Rate 2026.

  • 70%: minimum on each exam component.
  • 1 year: window within which both components must be passed.
  • 3 hours / 1 hour: time for written inspection and plans reading respectively.
  • About 80 / about 20: multiple-choice question counts.
  • 5 years: certification validity after requirements are satisfied.
  • 80%: quiz threshold in the public on-demand course. This is a course quiz rule, not the certification passing score.

Key Takeaway

Do not let the course's 80% quiz bar leak into your expectations for the real exam. The certification requires at least 70% on each component. Likewise, 10 PDH / 1 CEU of course credit is not exam duration and does not substitute for recertification requirements.

Reference Labels That Disagree

Open-book exams reward knowing exactly which book sits in front of you. The issuer's own sources label several references differently, and the safest approach is to keep each label as published and confirm the authorized list with your Sponsoring Group before purchasing anything.

SubjectLive Program LabelJTA / Reviewed CP-21 Label
CRSI referenceManual of Standard InspectionManual of Standard Practice
Inspection manualMNL-2 (no edition stated)ACI SP-2, Manual of Concrete Inspection (JTA); MNL-2(19) (CP-21)
ACI 301 titleSpecifications for Concrete ConstructionSpecifications for Structural Concrete
ACI 308R curing guideTitles and reapproval suffixes differ across sources (308R-01 versus 308R-01(08))

Pinned program references include CT-16, 117-10(15), PRC-213-14, 301-16, 302.1R-15, 304R-00(09), 304.2R-96, 305R-10, 306R-10, 308R-01, 309R-05, 318-14 (chapters 1-2, 17, 19-20 and 25-26), 347R-14, and IBC 2015 chapters 17 and 19. A reviewed CP-21 record adds suffixes such as 304.2R-96(08) and 308R-01(08), and lists the CRSI Manual of Standard Practice, 2009. The CP-21 store page could not be retrieved during our latest check, so treat those labels as provenance rather than confirmed current availability. Never substitute newer code editions for the listed ones, since an open-book answer keyed to the wrong edition is a classic way to lose points.

Plans-Reading Checklist

The plans-reading component is short, about 20 questions in an hour, and it rewards a repeatable scan routine. The public task headings point to these items:

  1. Drawing identity: titles, numbers, revisions and approval dates. Confirm you are reading the current sheet.
  2. Reinforcing: size, grade, location, spacing and splicing.
  3. Tolerances: placement, spacing and cover.
  4. Schedules: hooks, bends, ties, stirrups and supplemental reinforcement.
  5. Forms: concrete-form shapes and sizes.
  6. Details: sections and general requirements, plus information that must be assembled across multiple drawings.
  7. Locators: stations, grids and detail references.
  8. Preparation: subgrade and form-surface preparation, joints and blockouts.
  9. Mix requirements: specified strength, slump, admixtures, exposure and durability.
  10. Embedded items: post-tensioning steel, dowels and other embedments.
Multi-sheet habit: Many plans questions cannot be answered from a single drawing. Practice tracing a callout on a plan to its section detail and then to the general notes or schedule. Independently authored drawing exercises, including ours, are supplementary and cannot certify field competence.

The policy also names field operations the inspector must understand: installation and removal of formwork, reinforcement, embedments, conveying, placement, consolidation, finishing, jointing, curing and protection, plus drilled piers, pilings, pavements and soil cement where appropriate. These are scope flags, not separately weighted domains.

The Supplementary Training Curriculum

ACI's public on-demand course is organized into five modules: (1) inspection and the inspector, reports, statistical quality assurance, inspecting and testing materials, handling and storage; (2) concrete fundamentals, proportioning and control of mixtures, batching and mixing; (3) preconcreting inspection, concreting operations, form removal, reshoring, curing and protection, and postconstruction inspection; (4) building slabs, pavement slabs and bridge decks, architectural concrete, and special methods; (5) special concrete, precast and prestressed concrete, grout, mortar and stucco, and testing, records and reports. These modules are supplementary and unweighted, not five extra official domains. See CCSI Training for how courses and exam preparation fit together.

Cost Items Kept Separate

The most common budgeting error is blending three different things: exam fees, reference books, and courses. Local Sponsoring Groups set examination prices, so there is no single national standalone fee to quote.

ItemFigureCaveat
ACI Intermountain, October 2026 Salt Lake County bundleUSD 1,350 member / USD 1,450 nonmemberIncludes guides, three review days and both exams; review October 5-7, exam October 8. A dated local bundle, not a national fee or a guarantee of seats.
CP-21 reference package (reviewed record)USD 305 member / USD 575 nonmemberCurrent price not reconfirmed because the store retrieval failed.
Public on-demand courseUSD 290 member / USD 390 nonmember180-day access, 10 PDH / 1 CEU; not exam time or a recertification substitute.

For the full picture, including what is and is not included in each line, read CCSI Certification Cost 2026, and for scheduling realities see CCSI Exam Dates 2026. Questions about earnings and return on investment are handled in CCSI Salary Guide 2026 and Is the CCSI Certification Worth It?, and neither should be read as implying a measured certification premium.

A Domain-Ordered Review Sequence

Because both components are open book, the skill being tested is fast, accurate lookup. Sequence your review so that the references you will navigate most are tabbed first. The order below is a suggestion, not an official plan. For a fuller approach, see the CCSI Study Guide.

Week 1

Vocabulary and Tolerances

  • D1 terminology and D2 ACI 117 tolerance tables
  • Tab the tolerance tables you will reach for under time pressure
Week 2

Specifications and Placement

  • D4 ACI 301, D5 slabs, D6 and D7 placing and pumping
  • Mark where each guide discusses acceptance versus recommendation
Week 3

Weather, Curing, Consolidation

  • D8 hot weather, D9 cold weather, D10 curing, D11 consolidation
  • Compare the hot and cold weather guides side by side
Week 4

Code, Formwork and Inspection Manual

  • D12 chapters named in the program, D13 formwork, D14 inspection manual
  • Note exactly which ACI 318 chapters are pinned and skip the rest
Week 5

Building Code, CRSI and Plans Reading

  • D15 IBC chapters 17 and 19, D16 CRSI, D17 drawing exercises
  • Run timed plans sets using the ten-point checklist above

If you are building the right practice habits, our CCSI practice tests provide independently authored supplementary questions you can use alongside the issuer's materials. They are not actual exam questions and cannot replace the Field Technician requirement, field experience, or ACI assessment.

FAQ

Is the CCSI a single exam?

No. It has two separate components: roughly 80 written-inspection questions in three hours and roughly 20 plans-reading questions in one hour. Each requires at least 70%, and both must be passed within one year of each other.

Are the exams open book?

Yes, both components allow approved listed technical references. Because the listed editions matter, confirm the authorized reference list with your Sponsoring Group and do not substitute newer editions of codes or guides.

Do I need Field Testing Technician Grade I first?

Full certification requires current ACI Concrete Field Testing Technician Grade I, or previous Grade I plus passing its current written exam within one year of your first Inspector exam passed. Its practical assessment is separate and is not part of the CCSI exam.

How long does the certification last, and how does renewal work?

It is valid for five years after all requirements are met. Recertification applies current criteria, including the Grade I condition and both examinations, and experience is not reevaluated for renewal at the same level. See CCSI Certification for more.

Is there an official weighting for the 17 domains?

No. The seventeen items are reference headings drawn from the public Job-Task Analysis plus the plans-reading component, and they do not form an official weighted blueprint. No topic is published as highest-weighted, so distribute review time across all of them.

Keep this sheet beside the primary sources, verify every edition-specific detail with your Sponsoring Group, and use independently authored practice as a supplement to, not a substitute for, field experience and the issuer's own requirements.

Ready to pass your CCSI exam?

Put this into practice with free CCSI questions across every exam domain.